Description
The practical training system of YL-1202A smart microgrid is in urgent need of general talents in electrical technology at the terminal layer of smart microgrid, including the access of distributed power supply (wind power, photovoltaic and other clean energy and renewable energy), the promotion of time-division step-step electricity price, and the friendly interaction between users and power grid companies.
YL – 1202A of intelligence training system for micro power grid in a typical wind, light, oil, storage, micro power grid intelligent power supply system and set up by the regional intelligent power management service network as the breakthrough point, the smart microgrid technology for integrated design and layout, which can realize from the network, parallel operation of distributed power supply, electricity can two-way measuring work.The basic control mode of power dispatching SCADA is integrated.Through communication, the friendly interaction between power grid and users can be realized, and the power query can be realized.
“Yl-1202A Smart microgrid Training System” is a practical training and assessment equipment based on the design of a regional smart microgrid power supply and distribution system, which can operate in isolation, connected with the grid and mixed with the grid. During the connected operation, the power can be directly purchased from the grid or sold to the grid, or charged or discharged by battery controller.When the isolated network is running, there are wind power, solar panels, gasoline generators, energy storage system, balance the load power, if there is excess power generation, the excess energy will be stored in the battery.
The equipment is composed of a complete system consisting of a simulated regional communication system, a simulated regional intelligent micro-grid service platform, a simulated distributed power system, and a simulated load unit cabinet, which occupies a small area and is convenient for practical training.The equipment can meet the practical training and assessment equipment of multi-level teaching. Various intelligent distribution modes are designed and arranged, and multi-level control of information layer (monitoring level) and equipment layer (field level) is realized through communication.With training teaching equipment is more perfect than before more parameters real-time configuration and more complete functions of setting (such as real-time measurement, given more power change and control), implement the real-time control system, and the simulation of real and reflects the control process of the smart grid, training content, variety, at the same time, the outlet and inlet line of equipment of plastic fittings and hose connection with controlled object, a controlled object using external for observation, etc.Is a typical vocational ability training equipment, through the practical training on the equipment, students’ vocational ability can be greatly improved.
Basic equipment parameters
1) Input power supply: three-phase five-wire system, 380V±10% 50Hz
2) Working environment: temperature -10℃ ~ +40℃ Relative humidity ≤85% altitude ≤2000m
3) Device capacity: ≤10kVA
About Packing&Shipping








