Motor And Transformer Repair And Maintenance Trainer

training bench surface uses high density board of high insulation, high density, high temperature resistance. With function of grounding protection, electric leakage production, safety conforms to national standard. Secure sockets are of high insulation, high density safety training wire is with insulation sheath;

Category:
Brands:

Description

Training project

Motor and Transformer Repair and Maintenance Trainer includes the following programs

  • Transformer rewind and inspection experiment;

1) Data record and rewind data calculate and confirm before dismantle of transformer;

2) Disintegration of transformer winding;

3) Transformer coil winding;

4) Assembly of transformer;

5) Measurement of transformer insulated resistance;

6) Transformer AC disruptive test;

7) Measurement of transformer DC resistance;

8) Transformer ration of transformation test;

9) Transformer no-load test;

10) Transformer short circuit test;

11) Distinguish of transformer dotted terminal;

  • Rewind and inspection of single-phase capacitance running asynchronous motor;

1) Data record and calculation of single phase capacitance running asynchronous motor;

2) Winding dismantle of single phase capacitance running asynchronous motor;

3) Coil winding of single phase capacitance running asynchronous motor;

4) Inserting winding and assembly of single-phase running asynchronous motor;

5) Insulated resistance measurement of single-phase capacitance running asynchronous motor;

6) Single phase capacitance running asynchronous motor AC voltage withstand test;

7) DC resistance measurement of single phase capacitance running asynchronous motor under cold

state;

8) No-load of single phase capacitance running asynchronous motor;

  • Enwinding and inspection of three-phase squirrel cage asynchronous motor

1) Rewind data record and calculation of 3-phase squirrel cage asynchronous motor;

2) Dismantle of 3-phase squirrel cage asynchronous motor;

3) Winding and enwinding of 3-phase squirrel asynchronous motor;

4) Assemble of 3-phase squirrel cage asynchronous motor;

5) Insulated resistance measurement of 3-phase squirrel cage asynchronous motor;

6) DC resistance measurement of 3-phase squirrel cage asynchronous motor;

7) AC voltage withstand training of 3-phase squirrel cage asynchronous motor;

8) Head end and tail end judgment of 3-phase squirrel cage asynchronous motor;

9) No-load of 3-phase squirrel cage asynchronous motor;

About Packing&Shipping

QQ20201127154315

QQ20201127154341

Motor and Transformer Repair and Maintenance Trainer has the following technical parameters for reference

1. Working power: three-phase AC 380 V±10% 50 Hz;

2. Dimension: 1300×750×1150mm;

3. Overall power: ≤1.5KVA;

4. Environment temperature:-5℃~+40℃; relative humidity: ≤ 90%(25℃)

5. Safety precautions: training bench surface uses high density board of high insulation, high density, high temperature resistance. With function of grounding protection, electric leakage production, safety conforms to national standard. Secure sockets are of high insulation, high density safety training wire is with insulation sheath;